Case Study

Green Park 5

  • In Construction
  • Agri-Centric 
  • Italy 
capacity

850 Nm3 Biogas/Hour 45 GWh / biomethane / year at full capacity

operation date

2026

feedstock

Cow and buffalo manure

Impact

Supplying the gas needs of around 3,000 Italian homes. Admitted to the 5th GSE auction.

additional details

Direct grid injection. Biogasclean desulphurisation technology reduces H2S from 4,000 to 200 PPM

The first plant to be built by Cycle0 in Italy.

The plant will use feedstocks from farms within a 15km radius of its location. The biogas will then be upgraded to biomethane using proprietary Cycle0 technology and injected directly into the SNAM gas grid through a new local direct pipeline access, planned as part of the plant’s construction. 