Green Park 5
-
In Construction
-
Agri-Centric
-
Italy
850 Nm3 Biogas/Hour 45 GWh / biomethane / year at full capacity
2026
Cow and buffalo manure
Supplying the gas needs of around 3,000 Italian homes. Admitted to the 5th GSE auction.
Direct grid injection. Biogasclean desulphurisation technology reduces H2S from 4,000 to 200 PPM
The first plant to be built by Cycle0 in Italy.
The plant will use feedstocks from farms within a 15km radius of its location. The biogas will then be upgraded to biomethane using proprietary Cycle0 technology and injected directly into the SNAM gas grid through a new local direct pipeline access, planned as part of the plant’s construction.
This plant will produce certified renewable energy in accordance with EU standards.