Case Study
Lleida Cluster
-
Operational
-
Agri-Centric
-
Spain
capacity
250 Nm3 Biogas/Hour (2 plants) 14 GWh / year of biomethane per plant
operation date
2024
feedstock
Cow manure
Impact
CI score < -95 (grCO2/ MJ)
additional details
Hub and spoke design. Virtual pipeline.
An agri-centric hub and spoke cluster of up to 8 plants. Developed in collaboration with a livestock farmer, the small-scale plants produce biomethane which is transported to the Cycle0 grid injection point at Balaguer, using a virtual pipeline.