Case Study

Lleida Cluster

  • Operational
  • Agri-Centric 
  • Spain 
capacity

250 Nm3 Biogas/Hour (2 plants) 14 GWh / year of biomethane per plant

operation date

2024

feedstock

Cow manure

Impact

CI score < -95 (grCO2/ MJ)

additional details

Hub and spoke design. Virtual pipeline.

An agri-centric hub and spoke cluster of up to 8 plants. Developed in collaboration with a livestock farmer, the small-scale plants produce biomethane which is transported to the Cycle0 grid injection point at Balaguer, using a virtual pipeline.